Terminals are not a mobile UX
SSH and raw logs work, but they are not built for reviewing diffs, approvals, and long-running coding tasks on the go.
PocketMan by GetNextLayer
PocketMan is a mobile control console for local AI coding workflows. Start tasks from Android, watch live progress, approve risky actions, review diffs, send follow-ups, and prepare commits without staying glued to your desktop.
In active development. Coming soon. Built local-first by design.
The gap
Local agents can inspect repositories, edit files, run commands, and iterate quickly. But managing that workflow from your phone often means raw terminals, remote desktops, SSH sessions, or scattered logs.
PocketMan is designed around a clearer control loop: see what the agent is doing, approve actions with context, review the result, and decide what happens next.
SSH and raw logs work, but they are not built for reviewing diffs, approvals, and long-running coding tasks on the go.
File changes and commands should be reviewed with working directory, risk level, and task state visible before approval.
PocketMan is designed around a Desktop Agent controlling local Codex without exposing your workflow as a public remote service.
Product proof
These concept boards show PocketMan as a control console, not a mobile IDE: desktop readiness, task creation, live approvals, diff review, follow-up, commit, and PR preparation.
Step 1
Check Codex readiness, local API status, project access, and pairing state before starting work from Android.
Step 2
Pick a local project, describe the task, choose the workflow mode, and start a Codex thread from your phone.
Step 3
Follow the agent timeline and approve or deny commands and file changes with context.
Step 4
Inspect changed files, send follow-up instructions, validate tests, and prepare the final commit or PR.
Workflow
Pair Android with the PocketMan Desktop Agent and select a local project.
Describe what you want Codex to do and choose a safe execution mode.
Follow the live timeline, review commands or file changes, and approve or deny risky actions.
Inspect changed files, send follow-up instructions, run tests, commit, and prepare a PR.
Control surface
Track task progress as it happens: thread creation, file reads, commands, tests, approvals, and completion state.
Review risky commands and file changes before they continue, with context visible on mobile.
See changed files and review the result before committing anything.
Send additional instructions into the same Codex thread instead of starting over.
Codex runs through your machine. PocketMan is designed around local control rather than cloud execution by default.
Move from completed task to commit and PR preparation with a focused review workflow.
Product concept
Check Codex installation, auth state, local API health, and phone pairing from the Desktop Agent.
Monitor live task state and approve or deny actions with command, directory, and risk context.
Review diffs, ask for follow-up changes, validate tests, and prepare the final commit or PR.
Audience
Keep coding tasks moving while away from the keyboard, without handing your project to an opaque cloud workflow.
Start, monitor, and review implementation tasks while juggling product, support, and operations.
Use local Codex more comfortably with approvals, timelines, diffs, and follow-ups designed as a product flow.
Control the workflow from your phone without turning the phone into a cramped IDE or terminal.
Current build focus
PocketMan is being built as a real local-first control surface, not a remote desktop skin. The current work is focused on the Desktop Agent first; the Android app, approvals, pairing, and release packaging follow after that foundation is solid.
We would rather be transparent early than pretend the product is finished.
Support
PocketMan is being developed in public with limited resources. Support helps cover model usage, Codex runs, Android/Desktop testing, packaging, signing, hosting, and faster iteration.
Support links are coming soon. For now, follow the build on X or join the waitlist for updates.
Early interest
Get build updates, design notes, and possible testing invitations when PocketMan is ready for outside feedback. The form opens via Tally.
Share your email and a short note through the Tally form. Joining the list does not guarantee beta access or release timing, but it helps prioritize what to build next.
Join waitlistIf the popup does not open, use the direct Tally form link: https://tally.so/r/GxYKlL